Line Boardby RetailNorthstar

Line board checklist

By Published Editorial policy

44 checks across eight sections for getting a line board ready to review — so the meeting is spent on judgement rather than on working out whose numbers are current.

Free, no email required. Print it or work down it on screen before your next line review.

The short version
A line board is review-ready when every style carries a current image, category, colorway count, and price tier; when option counts have been recalculated since the last round of cuts; when category, colour, and price-tier balance have been checked against the line plan rather than against habit; and when there is a clear place to record status, cuts, and sign-off. The failure this prevents is spending the first twenty minutes of a cross-functional review reconciling files.

1. Every style carries its required fields

A board is only reviewable if every tile can be judged. Missing fields do not slow the review down evenly — they push the room into discussing whichever styles are complete.

2. The board is current, not last round’s

Walking a stale board is the single most common way to waste a line review. These checks take minutes and protect an hour of cross-functional time.

3. Category balance holds

Category balance is a whole-range property. It is invisible style by style and obvious on a board, which is most of the reason the board exists.

4. The colour story reads

Colour is where over-expansion hides. Fourteen colourways of one silhouette and fourteen distinct styles produce the same option count and completely different ranges.

5. Price architecture is intentional

Good / better / best should be a decision, not an outcome. A range that drifted into its price spread is usually heavy in the middle.

6. Option count reconciles to the plan

This is the check that most often fails silently, because the board and the plan are usually two different files.

7. Status and sign-off are unambiguous

A review that ends without a recorded decision gets re-litigated. The record is the deliverable, not a formality.

8. The range is ready to travel downstream

Sign-off is not the end of the board’s job. What matters next is whether the decided range can move without being retyped.

Not every check applies to every team

A small range reviewed by three people who all know it does not need a formal status field per style, and margin checks belong in the review only where margin is actually in scope at that stage. Treat this as a superset to cut down from rather than a bar to clear. The sections that repay attention regardless of range size are option-count reconciliation and the cut record — those two fail quietly, and their failures surface late.

See the Platform

Frequently asked questions

What should be on a line board before a line review?
At minimum every style needs a current image, a category, its colorway count, and a price tier, with option counts recalculated after the most recent cuts. Beyond the per-style fields, the board should be checked as a whole for category balance against the line plan, colour story spread, price-tier architecture, and reconciliation of total option count to the plan. The full checklist on this page covers eight sections, from required style fields through downstream readiness.
How do you know if a line board is review-ready?
The practical test is whether the room can spend its time on judgement rather than reconciliation. If the first twenty minutes of a review go on establishing which version of the option count is correct or what a style currently costs, the board was not ready. Every item in the “board is current” section of this checklist exists to prevent that specific failure.
Who owns getting the line board ready?
Usually merchandising, working with design on images and product development on costs and feasibility. The important thing is that it is owned by a named person rather than assumed: boards go into reviews stale most often when preparation is everyone’s job in general and nobody’s in particular.
Is this checklist specific to apparel?
It is written in apparel vocabulary, but the structure applies to any category planned as a seasonal range with visual product — footwear, accessories and bags, and home and furniture teams run the same sequence with different terms. Footwear teams read “colorways” as colour and material combinations across a size run; home teams read it as finishes and options. The balance, price architecture, and sign-off checks are unchanged.

See how a line board works when it is connected to the plan. Canvas — the visual line board inside RetailNorthstar — links the board to open-to-buy, the assortment, sizing, purchase orders, and production, so the board stays live instead of going stale.