Line Boardby RetailNorthstar

What is a line plan?

By Published Editorial policy

A line plan is the numeric architecture of a season’s line: the planned option slots by category, price tier and delivery, with the planned units, retail, target cost and margin each slot carries, agreed before the styles exist. It is a table. It has a header that states what it governs and in what unit, one row for every option the season intends to carry, and a set of totals that have to reconcile to money and limits set outside it: the open-to-buy at cost, the planned receipts at retail, the option ceiling and the margin target.

This page is about the document itself — what it contains, how to read it and how it changes through the season. The process that produces it is on what is line planning; the seven steps that fill it in, with their arithmetic, are on how to build a line plan; the visual surface it is argued over is defined in what is a line board; and the plan, the board and the line sheet are told apart in line board vs line sheet vs line plan. If your team calls this a range plan, it is the same document under the vocabulary mapped in how to build a range plan.

Below: what the plan is and is not, the header block, the grain of a row and how it moves by vertical, the columns a real plan carries, the seven totals it has to reconcile to, an illustrative two-drop plan whose every total is recomputed, how a planner, a designer, a buyer and finance each read it, the five versions from strategy draft to hindsight, where it sits beside the board, the sheet, the range plan and the assortment plan, how the document differs in footwear, beauty, home, toys and jewelry, and the defects that recur.

The short version
A line plan is a table of counted, costed slots. The header says which category and season it governs, what one row stands for, which version it is and who owns it. Each row is one planned option slot: its tier and planned retail, its target cost and markup, its planned units, the receipt dollars those units claim at cost and at retail, the delivery it lands in, whether it is carryover or new, the fabric it is planned on, the channels it serves, and its status. The totals rows sum those slots by tier, by delivery and by material and reconcile them to the open-to-buy, the receipts plan, the option ceiling and the margin target. The plan is finished when every total reconciles and every row has an owner; it is useful only while the board cannot drift from it.
Definition — Line plan
The numeric architecture of a season’s line — planned option slots by category, price tier and delivery, with the units, retail, target cost and margin each slot carries — agreed before the styles exist, cut in dated versions from strategy draft to hindsight, and reconciled at every version to the open-to-buy at cost, the receipts plan at retail, the option ceiling and the margin target.
One row = one planned option slot · Receipts at cost = Σ units × target cost ≤ open-to-buy · Blended IMU = (Σ units × retail − Σ units × cost) ÷ Σ units × retail ≥ margin target
Used by: Merchandise planning owns it, with merchandising and finance; design builds to it and proposes against it; buying and wholesale read it by delivery and channel
Related: Line planning, line board, line sheet, range plan, assortment plan, open-to-buy, option count, price architecture, initial markup, carryover, drop

What a line plan is, and what it is not

A line plan is the agreement, in numbers, about what a season’s line will be allowed to be. It is written before design draws anything, which is the whole point: it turns the money the financial plan gave the category into a frame of empty, counted, costed slots, so that development fills a frame rather than drawing a pile of ideas that the buy then has to cut. Every slot in it is a promise in both directions. To design it says: this is a place in the line that will exist, at this price, in this delivery, on this fabric, at this depth — fill it. To finance it says: this is a claim on the open-to-buy of exactly units times cost, and all the claims sum to no more than the envelope.

It is not the line board. The board is the same counted slots turned into image-first cards, where design and merchandising decide which bodies and colors fill them and whether the result reads as a range; a plan cannot show that eleven Better options are nine variations of one idea, and a board cannot show that a cell is below the depth a factory will make at quoted cost. It is not the line sheet, which is written after the lock for accounts and carries wholesale prices, minimums and delivery windows. It is not the assortment plan, which takes the locked options and decides which channels, clusters and doors each goes to and how deep. And it is not the line planning process, which is the sequence of strategy, architecture, development, reviews, lock and handoff that the plan is the numeric record of.

Usage varies on one point worth stating. Some teams’ line plans also carry the style list — the plan becomes the design-and-merchandising agreement on what the collection contains, not only the envelope around it. That wider sense is the one used in line plan vs assortment plan. This page uses the narrower sense throughout, because it is the sense that keeps the plan and the board separable: the plan says how many; the board says which. In practice the two senses meet at the post-review version, when slots acquire style numbers, and the anatomy below covers that version too.

One more thing it is not: a spreadsheet of option counts with nothing to multiply them by. A column of counts by category is the strategy draft of a line plan, not a line plan. The document earns its name when every count has units, every unit has a cost and a retail, and the sums of those reconcile to something the plan did not set for itself.

The header block: what the plan states once

Above the rows, a line plan states the things every row inherits. Most of the arguments a plan gets into later are arguments that the header should have settled. Six things belong in it, and a plan missing any of them is a plan two people can read differently.

Category and season
What it states
Which slice of the line this plan governs, and which season
What goes wrong without it
A plan without a category is a season plan; a plan without a season cannot be hindsighted
Counting unit
What it states
What one row stands for: style-colorway, pair-run, shade, model-in-finish, design-in-metal
What goes wrong without it
A count without its unit cannot be checked against the board or the buy
Version and date
What it states
Which version this is, and when it was cut: strategy draft, architecture lock, post-review, post-lock, hindsight
What goes wrong without it
Two people arguing from two versions are not arguing about the same line
Owner
What it states
The named person who can change a cell, and who signs the lock
What goes wrong without it
A plan nobody owns is a record of the board, not a constraint on it
The envelope
What it states
The open-to-buy at cost the plan divides, the planned receipts at retail, the blended margin target and the option ceiling
What goes wrong without it
The totals rows reconcile to these; without them the plan only sums to itself
Price architecture
What it states
The tiers, their planned retails and target costs, and the planned depth per option in each tier
What goes wrong without it
Stated once so that every row inherits it and a tier price change moves every row at once

The counting unit is the field most often missing, and the one that does the most damage when it is. A plan that says a category holds twenty-four options means twenty-four styles to one reader and twenty-four style-colorways to another, and the two differ by the average number of colorways per style — a category that averages two or three colorways per style is counting two or three times over. The board will be counted in style-colorways because that is what a card is; if the plan was counted in styles, the board will look two or three times over its count at the first review, and the room will spend the meeting discovering that nobody is wrong. The counting units and the conversion arithmetic between them are on what counts as one option.

The envelope belongs in the header for a different reason. A plan that carries its own targets only in a totals row can be made to pass by editing the target; a plan whose header states the open-to-buy at cost, the receipts plan at retail, the margin target and the option ceiling as inputs — with where they came from — has to pass against numbers it did not set. The price architecture is there so that every row inherits its tier’s planned retail and target cost from one place: when the Better retail moves from $90 to $95, nine rows move with it and the markup column recomputes, rather than nine cells being edited by hand and one being missed. See line architecture: good, better, best for how the ladder itself is set.

The grain: one row is one planned option slot

A line plan is built at one of two grains, and the choice decides what the document can and cannot do. At the coarser grain, one row is one cell — a category, a price tier and a delivery — carrying an option count, a planned depth per option and the units that count times depth produces. That is the grain of the strategy draft and of the summary tables that go to leadership. At the finer grain, one row is one planned option slot: a single place in the line, with its own units, retail, cost, delivery, flag, platform and channel. That is the grain of the working plan, and it is the one this page describes, because the cell grain can always be produced from it by summing and the reverse is not true.

The slot grain matters because slots are not identical inside a cell. In the illustrative plan further down, the Good tier in the first drop holds five slots: a carryover anchor at 700 units, a second carryover at 500, two new poplin bodies at 500 and a new linen body at 400. At cell grain that is five options at an average depth of 520; at slot grain it is a hero that is the deepest thing in the category and a test that is the shallowest, and the two should not be bought, costed or reviewed the same way. A board card can be matched to a slot; it cannot be matched to an average.

What one slot stands for changes by vertical, and the header has to say which. The unit is whatever the buy will be placed in and the board will be counted in, which is not always a style-colorway.

Apparel
One slot is
A style-colorway carrying a size run
Phased against
Drops or floor sets
Depth bounded by
Fabric and trim minimums per color
Footwear
One slot is
A style-colorway committing a full size run of pairs, and a width run where widths are offered
Phased against
Model-year introductions and seasonal colorway refreshes
Depth bounded by
Pairs per size run, last and tooling minimums
Beauty
One slot is
A shade or variant within a franchise
Phased against
Launch windows and retailer gondola resets
Depth bounded by
Batch minimums per shade, shelf life and period-after-opening
Home and furniture
One slot is
A model in a finish, fabric or configuration
Phased against
Floor sets, market dates and dealer prebook windows
Depth bounded by
Container minimums and ocean lead time
Toys and juvenile
One slot is
An item, sometimes with a pack or case-pack variant
Phased against
The gifting peak and licensed windows
Depth bounded by
Tooling, safety testing and license dates
Jewelry and watches
One slot is
A design in a metal, sometimes by stone grade
Phased against
Model-year launches and the gifting peak
Depth bounded by
Precious-metal cost base and casting or movement minimums

Two consequences follow from the grain. First, a slot exists before the option that fills it, so it needs an identity of its own — a slot ID that the board card, the costing sheet and eventually the style number all key back to. A plan that waits for style numbers to identify its rows cannot be locked at architecture, because there is nothing yet to lock. Second, units live on the slot, not on the cell: when a card is cut at line review, the slot’s units go back to the cell for redistribution or to the reserve, and the plan shows that; when a card is added without a slot, the cell’s units are divided one more way and every slot in the cell gets shallower, and the plan shows that too. A plan at cell grain shows neither; it shows a count that went from five to six.

The columns a real line plan carries

Twelve columns, read in five groups below, do the work. Some are inherited from the header through the tier, some are set per slot, and three are computed. Each column exists because some reader downstream has a question only it can answer; a column nobody reads is a column that will be wrong by the second version.

Slot or option ID
Role
Identity
What it states
A stable key for the planned slot, before any style number exists
What it does downstream
The board card, the costing sheet and the buy all key off it
Category / class
Role
Placement
What it states
The merchandise hierarchy node the slot belongs to
What it does downstream
Rolls the plan up to the financial plan’s category lines
Price tier and planned retail
Role
Price
What it states
Good, better or best (or the brand’s own ladder), and the retail the slot is planned at
What it does downstream
Sets the retail receipts and, with cost, the slot’s markup
Target cost and IMU
Role
Margin
What it states
The landed cost the slot must come in at, and the initial markup that implies
What it does downstream
The margin check runs on these until quotes replace them
Planned units
Role
Depth
What it states
The receipt units the slot carries for the season
What it does downstream
Depth against minimums; units times cost is the slot’s claim on the envelope
Receipt dollars at cost and at retail
Role
Money
What it states
Units times target cost, and units times planned retail
What it does downstream
Sums to the open-to-buy and to the planned receipts at retail
Delivery or drop
Role
Timing
What it states
Which delivery, drop or floor set the slot lands in
What it does downstream
Phases units and newness across the season; drives the T&A calendar
Carryover / new
Role
Newness
What it states
Whether the slot is filled by a proven option or by newness design has yet to draw
What it does downstream
The newness rate, by option and by unit, falls out of this flag
Fabric platform / material group
Role
Supply
What it states
The fabric, material or component platform the slot is planned on
What it does downstream
Sums units per platform against mill or component minimums
Channel flags
Role
Distribution
What it states
Whether the slot serves all channels, direct only, wholesale only, or a named account exclusive
What it does downstream
Prevents a delivery that sums for the season and is empty for one channel
Status
Role
State
What it states
Planned, proposed, reconciled, locked, cost open, swapped, cut
What it does downstream
Tells each reader which cells can still move and which have released downstream work
Owner and notes
Role
Accountability
What it states
Who can change the cell; why it is what it is
What it does downstream
A cell with a reason survives a review; a cell without one gets re-argued

Identity and placement

The slot ID is the key everything else hangs off, and it should be dull: a tier letter and a sequence number is enough. It should never be the style number, because the style number arrives late and changes, and never the row number in a spreadsheet, because rows get sorted. The category or class column is the node of the merchandise hierarchy the slot rolls up to; it is how the plan reconciles to a financial plan written by category and month rather than by slot and drop. In a category plan it is the same on every row and still worth carrying, because the season roll-up will stack this plan under the others.

Price and margin

Price tier and planned retail are inherited from the price architecture in the header; a slot planned off its tier’s retail is either a mistake or a deliberate price point within the tier, and the plan should say which. Target cost is the landed cost the slot must come in at for its markup to hold, and initial markup is a computed column — (retail − cost) ÷ retail — never typed. Until quotes confirm, the cost column is a target and the status column should say so; after the commercial lock, it is a quote, and the markup that is signed is the one that ships. How target cost is derived from a margin goal, and where the cost base moves after the plan is set, is on costing the line to a margin target.

Depth and money

Planned units is the single most important number on the row, because every reconciliation is a sum of it multiplied by something. It is set per slot from the tier’s planned depth, adjusted for the slot’s role: the anchor carryover deeper, the test shallower, the hero deepest in its tier. Receipt dollars at cost — units times target cost — is the slot’s claim on the open-to-buy. Receipt dollars at retail — units times planned retail — is the slot’s contribution to the receipts plan and the base the blended markup is weighted on. Both are computed; both should appear on the row, because a reader checking one slot should not need a calculator.

Timing and newness

The delivery column places the slot in a drop, floor set, launch window or prebook window. It is what lets the plan be read by delivery as well as by tier, and a delivery read is where most seasons find their first problem: a line that sums for the season and lands four-fifths of its newness in the second drop. The carryover or new flag is set at architecture — the carryover slots the hindsight has earned are placed first, by name, and the remainder of each cell is new — and it drives two rates that have to be read together: newness by slot and newness by unit. They differ whenever carryover is bought deeper than newness, which is the common case. The per-slot decision is on balancing carryover and newness; the delivery rhythm on planning drops on the line board.

Supply, distribution and state

The fabric platform or material group column is the one most plans leave out and most plans need, because option counts that pass factory minimums per style routinely fail mill minimums per fabric: six fabrics at 350 units each when the mill wants the equivalent of 500 garments per fabric. Summing units by platform is only possible if every slot names one. Channel flags — all, direct only, wholesale only, a named account exclusive — exist so the plan can be summed by channel and delivery; without them a season can pass every total and still hand wholesale a delivery with nothing for an account to book. Status is the column that tells each reader what can still move. A small, fixed vocabulary is enough: planned, proposed, reconciled, locked, cost open, swapped, cut. Owner and notes are the columns that make the plan survive a review: a cell with a named owner and a one-line reason gets confirmed in a sentence; a cell with neither gets re-argued from the start.

The totals rows a line plan must reconcile to

A line plan’s totals are not a footer. They are the reason the document exists: the point at which a set of slot-level intentions is tested against money and limits that were set before the plan and outside it. Seven reconciliations, and a plan is not finished until all seven are either passing or flagged with an owner and a date.

Open-to-buy at cost
How it is computed
Sum of units × target cost across every slot
Reconciled to
The category’s open-to-buy envelope at cost, less any in-season reserve
If it is skipped
A plan that overspends the envelope is corrected at the buy, after development money is spent
Planned receipts at retail
How it is computed
Sum of units × planned retail across every slot
Reconciled to
The merchandise financial plan’s receipt line for the category
If it is skipped
A plan short at retail cannot deliver the sales plan it inherited
Option count
How it is computed
Count of slots, by tier and by delivery
Reconciled to
The option ceiling set at the architecture stage from minimums and budget
If it is skipped
A plan at its ceiling has no room for a short booking or a cost move
Blended initial markup
How it is computed
(Retail − cost) ÷ retail, weighted by retail dollars: (Σ units × retail − Σ units × cost) ÷ Σ units × retail
Reconciled to
The category’s margin target
If it is skipped
A plan that passes by tier can still fail in blend if the mix tilts to the low-markup tier
Newness share
How it is computed
New slots ÷ all slots, and new units ÷ all units
Reconciled to
The newness target the strategy set
If it is skipped
The two rates differ whenever carryover is deeper than newness, and both have to be read
Units per platform
How it is computed
Sum of units by fabric or material group
Reconciled to
The mill, component or tooling minimum for that platform
If it is skipped
An option count that passes factory minimums can still fail on fabric
Units per delivery
How it is computed
Sum of units by drop
Reconciled to
The delivery calendar and the floor or account capacity in that window
If it is skipped
A season that sums can still overload one delivery and starve another

The two money totals come first because they are the ones finance will read. Receipts at cost against the open-to-buy is the hard constraint: an overspend here is corrected at the buy, after development, sampling and costing money have been spent on slots that will then be cut. Receipts at retail against the financial plan’s receipt line is the softer one — a plan that lands under it has, in effect, planned not to make the sales plan it inherited, which is sometimes right and should always be visible. Where the open-to-buy itself comes from, and how an envelope at cost becomes a supportable option count, is worked through on what is line planning.

The blended markup against target is the total that passes by tier and fails in blend. A plan can hold every tier at or above its target markup and still miss the blended target, because the blend is weighted by retail dollars and a plan that puts most of its units in the lowest-markup tier blends toward that tier. The option count only has the same property when the category ceiling is set below the sum of the tier ceilings. The newness share is the reverse case: by slot it is usually comfortably above target, because new slots are many and shallow; by unit it is often below, because carryover is few and deep. Both numbers are true and both should be on the page.

The last two — units per platform and units per delivery — are the supply-side and calendar-side tests, and they are the ones that cannot be run at all unless the plan carries a platform column and a delivery column on every row. A plan that reconciles its first five totals and has no platform column has not been tested against the thing most likely to make it unbuyable.

An illustrative line plan: women’s dresses, three tiers, two drops, twenty-four slots

Every figure below is illustrative — not a benchmark, not drawn from any brand, and chosen so the arithmetic can be checked. It is a post-lock version, which is the version most people mean when they ask to see a line plan: counts locked, two slots still cost open.

The header, in prose. Category: women’s dresses. Season: a hypothetical spring with two drops. Counting unit: style-colorway. Version: post-lock, dated. Owner: the category planner, with merchandising signing the lock. Envelope: $250,000 open-to-buy at cost; $640,000 planned receipts at retail in the financial plan; a blended initial markup target of 61%; an option ceiling of 28, set at the architecture stage as 12 Good, 10 Better and 6 Best from the budget and the factory minimums. Price architecture: Good at $60 retail and a $24.00 target cost, a 60.0% initial markup; Better at $90 and $34.20, 62.0%; Best at $140 and $51.80, 63.0%. Planned depths of 500, 300 and 150 units per slot, with the anchor carryover deeper and the tests shallower. Factory minimums of 350, 200 and 120 units per slot in the three tiers.

Illustrative post-lock line plan at slot grain — women’s dresses, hypothetical season, two drops
SlotTierDropCarryover / newFabric platformChannelRetailTarget costIMUUnitsReceipts at costStatus
G-01Good1CarryoverCotton jerseyAll$60$24.0060.0%700$16,800Locked
G-02Good1CarryoverCotton jerseyAll$60$24.0060.0%500$12,000Locked
G-03Good1NewCotton poplinAll$60$24.0060.0%500$12,000Locked
G-04Good1NewCotton poplinAll$60$24.0060.0%500$12,000Locked
G-05Good1NewLinen blendAll$60$24.0060.0%400$9,600Locked
G-06Good2CarryoverCotton jerseyAll$60$24.0060.0%500$12,000Locked
G-07Good2NewCotton jerseyAll$60$24.0060.0%500$12,000Locked
G-08Good2NewCotton poplinAll$60$24.0060.0%500$12,000Locked
G-09Good2NewLinen blendAll$60$24.0060.0%400$9,600Locked
G-10Good2NewLinen blendDirect only$60$24.0060.0%400$9,600Locked
B-01Better1CarryoverViscose crepeAll$90$34.2062.0%350$11,970Locked
B-02Better1NewViscose crepeAll$90$34.2062.0%300$10,260Locked
B-03Better1NewCotton poplinAll$90$34.2062.0%300$10,260Locked
B-04Better1NewLinen blendAll$90$34.2062.0%250$8,550Locked
B-05Better2CarryoverViscose crepeAll$90$34.2062.0%300$10,260Locked
B-06Better2NewViscose crepeAll$90$34.2062.0%300$10,260Locked
B-07Better2NewCotton poplinAll$90$34.2062.0%300$10,260Locked
B-08Better2NewLinen blendAll$90$34.2062.0%250$8,550Locked
B-09Better2NewLyocell twillDirect only$90$34.2062.0%200$6,840Cost open
S-01Best1NewSilk-blend satinAll$140$51.8063.0%200$10,360Locked
S-02Best1NewSilk-blend satinAll$140$51.8063.0%150$7,770Locked
S-03Best2NewSilk-blend satinAll$140$51.8063.0%150$7,770Locked
S-04Best2NewViscose crepeAll$140$51.8063.0%150$7,770Locked
S-05Best2NewLyocell twillWholesale only$140$51.8063.0%150$7,770Cost open
Category——5 / 196 platforms———61.25%8,250$246,2502 cost open

Read down the units column and the shape of the category is visible before any style exists. G-01 at 700 units is the anchor: the carryover jersey body that sells every season and is bought deepest. G-05, G-09 and G-10 at 400 are the linen-blend slots, planned shallower because linen is a newer platform for the category. B-09 at 200 units is a test on a new lyocell twill, direct only, sitting exactly at the Better factory minimum. S-01 at 200 units is the Best hero, the deepest slot in its tier by a third. None of that reads at cell grain; at cell grain the Good tier in the first drop is five options at an average of 520 units.

Good
Slots
10
Carryover / new
3 / 7
Units
4,900
Receipts at cost
$117,600
Receipts at retail
$294,000
Initial markup
60.0%
Better
Slots
9
Carryover / new
2 / 7
Units
2,550
Receipts at cost
$87,210
Receipts at retail
$229,500
Initial markup
62.0%
Best
Slots
5
Carryover / new
0 / 5
Units
800
Receipts at cost
$41,440
Receipts at retail
$112,000
Initial markup
63.0%
Category
Slots
24
Carryover / new
5 / 19
Units
8,250
Receipts at cost
$246,250
Receipts at retail
$635,500
Initial markup
61.25%

By tier, Good holds ten slots and 4,900 units: 700 + 500 + 500 + 500 + 400 in the first drop is 2,600, and 500 + 500 + 500 + 400 + 400 in the second is 2,300. At $24.00 that is $117,600 at cost, and at $60 it is $294,000 at retail; (294,000 − 117,600) ÷ 294,000 is 60.0%. Better holds nine slots and 2,550 units — 1,200 in the first drop, 1,350 in the second — for $87,210 at cost and $229,500 at retail, a 62.0% markup. Best holds five slots and 800 units — 350 and 450 — for $41,440 at cost and $112,000 at retail, 63.0%. The category sums to 24 slots, 8,250 units, $246,250 at cost and $635,500 at retail, and the blended initial markup is (635,500 − 246,250) ÷ 635,500 = 389,250 ÷ 635,500, which is 61.25%.

Drop 1
Slots
11
Carryover / new
3 / 8
Units
4,150
Receipts at cost
$121,570
Receipts at retail
$313,000
Initial markup
about 61.2%
Drop 2
Slots
13
Carryover / new
2 / 11
Units
4,100
Receipts at cost
$124,680
Receipts at retail
$322,500
Initial markup
about 61.3%
Season
Slots
24
Carryover / new
5 / 19
Units
8,250
Receipts at cost
$246,250
Receipts at retail
$635,500
Initial markup
61.25%

By delivery, the first drop holds eleven slots and 4,150 units: 2,600 Good, 1,200 Better and 350 Best, for 62,400 + 41,040 + 18,130 = $121,570 at cost and 156,000 + 108,000 + 49,000 = $313,000 at retail. The second holds thirteen slots and 4,100 units: 2,300 + 1,350 + 450, for 55,200 + 46,170 + 23,310 = $124,680 at cost and 138,000 + 121,500 + 63,000 = $322,500 at retail. The drops sum to the same 8,250 units, $246,250 and $635,500 as the tiers do, which is the first test a plan has to pass: the tier read and the delivery read are two sums of one table, so they cannot disagree. The units are nearly level across the two drops, but the newness is not: three of the first drop’s eleven slots are carryover and only two of the second drop’s thirteen are, so the second drop is the newer one by slot and by unit, which is a deliberate choice to land the story after the anchors.

Cotton jersey
Slots
4
Units
2,200
Tiers it carries
Good
Cotton poplin
Slots
5
Units
2,100
Tiers it carries
Good and Better
Linen blend
Slots
5
Units
1,700
Tiers it carries
Good and Better
Viscose crepe
Slots
5
Units
1,400
Tiers it carries
Better and Best
Silk-blend satin
Slots
3
Units
500
Tiers it carries
Best
Lyocell twill
Slots
2
Units
350
Tiers it carries
Better and Best — both slots cost open
All platforms
Slots
24
Units
8,250
Tiers it carries
—

By platform, cotton jersey carries 2,200 units across four slots, cotton poplin 2,100 across five, linen blend 1,700 across five, viscose crepe 1,400 across five, silk-blend satin 500 across three and lyocell twill 350 across two — 8,250 again. This is the read that catches what the tier and drop reads cannot: the lyocell twill platform carries only 350 units across two slots, both cost open, so if the mill’s minimum for that fabric is above 350 garments’ worth, the platform fails even though both slots clear their factory minimums. That is a question the plan can now ask sourcing, with the number attached.

Open-to-buy at cost
Target
$250,000
Plan
$246,250
Variance
$3,750 under (1.5%)
Result
Passes
Planned receipts at retail
Target
$640,000
Plan
$635,500
Variance
$4,500 under (0.7%)
Result
Passes
Option ceiling
Target
28 (12 / 10 / 6)
Plan
24 (10 / 9 / 5)
Variance
4 slots of room
Result
Passes
Blended initial markup
Target
61.0%
Plan
61.25%
Variance
0.25 points of headroom
Result
Passes, narrowly
Newness by slot
Target
about 75%
Plan
19 of 24, about 79%
Variance
Above target
Result
Passes
Newness by unit
Target
—
Plan
5,900 of 8,250, about 72%
Variance
Carryover is deeper than newness
Result
Read, not tested
Slots below factory minimum
Target
None
Plan
None (B-09 sits exactly at its 200-unit minimum)
Variance
One slot with no room
Result
Flag

The reconciliation reads as follows. At cost, $246,250 against a $250,000 envelope leaves $3,750, or 1.5%, which is the plan’s entire room for a cost move. At retail, $635,500 against the financial plan’s $640,000 is $4,500 under, or 0.7%, close enough to call planned but worth a line in the notes. Twenty-four slots against a ceiling of 28 leaves four slots of room, distributed as two in Good, one in Better and one in Best. The blended markup of 61.25% against a 61% target passes by a quarter of a point. Newness by slot is 19 of 24, about 79%, above an illustrative 75% target; newness by unit is 5,900 of 8,250, about 72%, because the five carryover slots carry 2,350 units between them — an average of 470 against about 311 for a new slot. Both newness figures are true, and a plan that reports only the first will surprise the buy.

Now the sensitivity, which is why the headroom column exists. Suppose the two cost-open slots confirm at target but the silk-blend satin quotes come back worse, and the Best tier’s cost moves from $51.80 to $56.00. Best receipts at cost become 800 × $56 = $44,800, $3,360 over the $41,440 planned. Total cost becomes $249,610 — still $390 inside the $250,000 envelope, so the first reconciliation still passes. But Best’s markup falls to (140 − 56) ÷ 140 = 60.0%, and the blend falls to (635,500 − 249,610) ÷ 635,500, about 60.7%, which misses the 61% target. Two totals rows, two different answers to the same cost move: the envelope holds and the margin does not. A plan that carries only the envelope reconciliation would call this a pass. What to do about it — re-cost, re-tier, cut a Best slot, or accept the margin knowingly — is a line planning decision, and the point of the document is that the decision is made on the plan, before the buy, with the arithmetic on the page.

The same plan can be run as working formulas in the line plan workbook, whose sample category follows the knit-tops example on how to build a line plan rather than this one; the structure — slots, tiers, drops, minimums, the dollar-weighted blended markup — is identical. For a category-level plan without tiers or drops, the line plan template on retail-plan.com is simpler.

How to read a line plan: four readers, four questions

The same table is read four ways, and a plan is laid out well when each reader can find their answer without rebuilding it. The planner reads the totals, the designer reads the open slots, the buyer reads the deliveries and finance reads the money and what is still unconfirmed.

Merchandise planner
Reads
The totals rows against the envelope, the ceiling and the margin target; depth per slot against minimums; the headroom left for a cost move
The question
Does the plan reconcile, and where is the slack?
What they are looking for
A cell that passes on its own and fails in blend
Designer
Reads
The new slots by tier and delivery, the fabric platforms they are planned on, the depth each must carry, and which slots are still open
The question
How many bodies do I owe, in which fabrics, at which prices, by when?
What they are looking for
A slot whose depth or platform rules out the idea drawn for it
Buyer or wholesale lead
Reads
Units and newness by delivery, channel flags, carryover depth, and the retail ladder an account or a floor will see
The question
Does each delivery merchandise on its own, and is there enough to fill a floor set or a prebook?
What they are looking for
A delivery that sums for the season and is thin for one channel
Finance
Reads
Receipt dollars at cost against the open-to-buy, receipts at retail against the financial plan, blended markup against target, and the cost-open slots
The question
Is the category inside its money, and what is still unconfirmed?
What they are looking for
A margin that holds on target costs and not on quotes

The planner starts at the bottom. Do the seven totals reconcile, and where is the slack? In the illustrative plan the answer is that everything passes and the slack is thin: $3,750 at cost and a quarter of a point of markup. The planner’s second read is down the units column against the minimums in the header, looking for slots at or near a minimum — B-09 is the one — because a slot at minimum has no room for a short booking, and the planner’s third read is the status column, because two cost-open slots in the same new platform is one risk, not two.

The designer reads the plan as a brief. Filter to new, group by tier and drop, and the plan says: seven new Good bodies, three in the first drop on poplin and linen and four in the second on jersey, poplin and linen; seven new Better bodies across crepe, poplin, linen and one twill test; five new Best bodies, three on satin, one on crepe, one on twill. Each has a retail, a depth and a delivery, so the designer knows before drawing which ideas have a slot and which will have to displace one. The reserve list — concepts that did not fit, each named against the slot it would replace — belongs beside the plan for exactly this reader. How the brief turns into a board is on how to build a line board.

The buyer or wholesale lead reads across, by delivery and channel. Does each drop merchandise on its own? The first drop lands eleven slots including both Good carryover anchors and the Best hero; the second lands thirteen including the two direct-only slots and the one wholesale-only slot, so a wholesale account sees eleven of the second drop’s thirteen and a direct customer sees twelve. Is there enough for an account to fill a prebook? The plan can answer by channel because every slot is flagged. The buyer’s other read is carryover depth, because carryover is where the buy’s confidence is highest and the reorder most likely.

Finance reads two columns and one word. Receipts at cost against the envelope, receipts at retail against the plan, and the word open in the status column — because every cost-open slot is a number in the margin that is still a target, and finance’s question is how much of the signed margin is resting on targets rather than quotes. In the illustrative plan it is $14,610 at cost across 350 units, which is small; a plan where it is a third of the envelope has not been costed, whatever its markup column says.

The five versions of a line plan through the season

A line plan is not one document edited in place; it is a series of dated versions, each adding columns and certainty to the one before it. Five versions, and the discipline is that a later version never rewrites an earlier one — the architecture lock stays as it was cut, so that the hindsight can compare the line as planned with the line as bought and as sold.

Strategy draft
When
Before architecture; after the financial plan and hindsight
What it carries
Header, tiers and their retails, option counts by tier as ranges, newness share, delivery count
What is still open
No slot rows yet; counts are ranges, not cells
Owner
Merchandising, with planning
Architecture lock
When
Before design is briefed
What it carries
Every slot row with tier, delivery, carryover or new flag, planned units, target cost and IMU; totals reconcile to the envelope
What is still open
Slots have IDs but no style numbers; status is planned
Owner
Planning, signed by merchandising
Post-review
When
After each line review
What it carries
Slots mapped to proposed styles; swaps, cuts and adds recorded with reasons; fabric platforms confirmed; reserve list attached
What is still open
Counts may still move between cells; status is proposed or reconciled
Owner
Merchandising, with design and planning
Post-lock
When
After the final line review
What it carries
Counts locked cell by cell; style numbers in; costs confirmed or flagged open; status is locked, cost open, or swapped
What is still open
Change by swap only; an add has to name what comes out
Owner
Merchandising owns the lock; planning owns the numbers
Hindsight
When
After the season sells
What it carries
Actual receipts, sell-through at the read dates, markdown, realized margin appended to every slot
What is still open
Nothing planned changes; actuals sit beside the plan so next season reads the gap
Owner
Planning, read by everyone

Strategy draft

The first version has a header and no rows. It states the category’s role for the season, the tiers and their planned retails, an option count per tier as a range rather than a number, the newness share the strategy wants, and how many deliveries the season will have. It exists so that the architecture can be argued about before it is built: whether this is the season Best goes from four slots to six, whether the second drop should be the newer one, whether the linen platform is ready to carry three slots. Nothing in it reconciles yet, because nothing in it has units.

Architecture lock

The second version is the first real line plan: every slot row, with its tier, delivery, carryover or new flag, planned units, target cost and markup, and all seven totals reconciled to the header. It is cut before design is briefed, and it is the version design is briefed with. Slots have IDs and no style numbers; carryover slots are named, because the hindsight has already chosen them; new slots are empty frames with a price, a depth, a platform and a delivery. This is the version the illustrative plan would have been in before any status read anything but planned, and it is the one that the seven steps on how to build a line plan produce.

Post-review

There is one of these after every line review — usually two or three in a season — and each records what the review did to the plan: which proposed styles were mapped to which slots, which slots were swapped, which cards were cut and what happened to their units, which fabric platforms were confirmed and which changed, and what went to the reserve list. Counts can still move between cells at this stage, and the version shows them moving, with the reason in the notes column. The status vocabulary does its work here: a slot is proposed when design has put a style against it, reconciled when planning has rerun depth, minimum and margin on design’s numbers, and still planned when nothing has been put against it yet. How the review itself is run is on how to run a line review.

Post-lock

The version cut after the final line review is the one that releases downstream work: sampling to production, fabric bookings, the line sheet, the assortment build. Counts are locked cell by cell, style numbers are in, and the cost column is in the middle of changing from targets to quotes — which is why the status column needs cost open as well as locked. After this version the plan changes by swap only: a reserve concept can replace a locked slot in the same tier and delivery if it clears the same checks, and an addition has to name what comes out and who absorbs the cost of the work already released. What the lock commits, and the ladder of concept, range, commercial and buy locks that the one word covers, is on locking the line; where each lock sits in the calendar is on the line planning calendar.

Hindsight

The last version is the locked plan with actuals appended beside every slot: the receipts that actually landed, sell-through at the read dates, markdown taken, realized margin. Nothing planned is edited. The value is in the gap, slot by slot: the anchor that was bought at 700 and sold through, the test at 200 that should have been 400, the Best hero that carried the markup and the Best slot that gave it back in markdown. Read by tier, by delivery, by platform and by carryover flag, this version is the first input to the next season’s strategy draft, and the reason the architecture lock was never overwritten. The board-side read of the same season is on hindsighting the line.

The line plan beside the board, the sheet, the range plan and the assortment plan

Five documents get called the line, and they are told apart by what each contains, the question it answers, who owns it and when it exists. The detailed comparisons live on their own pages and are linked rather than re-argued here; the one-line version is that the plan says how many, the board says which, the sheet says what an account can order, the range plan is the plan under another vocabulary, and the assortment plan says where each locked option goes.

Line plan
What it contains
A table of counted slots with units, price, cost, margin and delivery
The question it answers
How many, at which tiers, in which deliveries, carrying what money?
Owner
Planning, with merchandising
When it exists
Before the styles exist; locked at line review
Line board
What it contains
The same counted slots as image-first cards, filled with styles and colors
The question it answers
Which bodies and colors fill the slots, and does the result read as a range?
Owner
Design and merchandising
When it exists
During development; walked at every line review
Line sheet
What it contains
The outbound wholesale document: style numbers, size runs, wholesale prices, minimums, delivery windows
The question it answers
What can an account order, at what terms?
Owner
Wholesale sales
When it exists
After lock, for sell-in
Range plan
What it contains
The same document as the line plan under the UK and European vocabulary
The question it answers
The same question, phrased as range breadth, depth and phasing
Owner
Planning or buying, with merchandising
When it exists
The same point in the season
Assortment plan
What it contains
The locked options by channel, cluster and door, with depth per door
The question it answers
Where does each locked option go, and how deep?
Owner
Planning and buying, with allocation
When it exists
After the lock, before and through the buy

The plan against the board and the sheet is on line board vs line sheet vs line plan. The range vocabulary is mapped word by word on how to build a range plan. The plan against the assortment plan is on line plan vs assortment plan, and the board-side version of that handoff on line board vs assortment board. The one relationship worth restating here is the plan’s with the board, because it is the one that fails most: the two are counted in the same unit or they are not comparable, and a card cut on the board changes a count in the plan or the plan has stopped being a constraint. The definition of the board, and of the visual line plan it is also called, is on what is a line board.

How the line plan document differs by vertical

The header, the grain, the columns and the seven totals hold in every vertical. What changes is what one row stands for, which column the depth is bounded by, and what the delivery column is phased against. A plan written for apparel and handed to a footwear or a furniture team is wrong in its unit before it is wrong in anything else.

In each case the test is the same one the header asks: is the row counted in the unit the buy will be placed in, and is the depth column bounded by the thing that will actually refuse the order — a factory, a mill, a mold, a container, a batch or a casting? The per-vertical bounds on the option count, for ten verticals, are on how to build a line plan.

The common defects in a line plan document

Most bad line plans are not wrong in their numbers; they are missing a column, a header field or a version, and the missing thing is what makes them wrong later. Seven defects recur, and each one has a one-line fix that is cheaper at architecture than at the buy.

Option counts without units
How it shows up
A column of counts and nothing to multiply them by
What it causes
The count cannot be tested against minimums, the envelope or the margin
The fix
Add planned units per slot before anyone argues about the count
A plan that cannot be summed
How it shows up
Tier rows and delivery rows kept on separate tabs with different totals
What it causes
Two readers reconcile to two different envelopes
The fix
One table at slot grain; every total is a sum of it
Cells with no owner
How it shows up
A header with a team name and no person
What it causes
Nobody can say yes to a swap, so adds happen instead
The fix
One named owner per plan; one named approver per cell change after lock
Unit mismatch between plan and board
How it shows up
The plan counts styles; the board shows style-colorways
What it causes
The board looks over its count or under it by the colorway factor
The fix
State the unit in the header and count the board in it
No version or date
How it shows up
The file is overwritten in place
What it causes
The hindsight compares the bought line with itself
The fix
Cut a dated version at each stage; never edit the lock
Target costs that never become quotes
How it shows up
IMU column still on targets after the commercial lock
What it causes
The margin that was signed is not the margin that ships
The fix
A status of cost open until the quote replaces the target
Channel-blind totals
How it shows up
No channel flag; one total for direct and wholesale
What it causes
A wholesale delivery with nothing for an account to book
The fix
Flag every slot; sum by channel and delivery

Option counts without units is the oldest defect and the most common, because a count is easy to agree and units are not. A plan that says Better holds nine options and stops there cannot be tested against anything: not the envelope, because nine times nothing is nothing; not the minimums, because there is no depth; not the margin, because there is no retail base to weight it on. The count feels like a decision and is not one. The fix is to refuse to discuss a count that has no units behind it, which is the discipline the architecture lock exists to enforce.

A plan that cannot be summed is the defect that comes from building the tier view and the delivery view as two separate tables. They start equal and drift: a swap is recorded on one tab and not the other, a cut moves units on the tier view and leaves them on the drop view, and by the final review the two reconcile to two different envelopes. The fix is structural: one table at slot grain, and every view a sum of it, so that the tier read and the delivery read cannot disagree because they are the same numbers added in a different order.

Cells with no owner is the defect that turns a plan from a constraint into a record. If nobody can say yes to a swap, the swap does not happen; the add happens instead, because an add needs nobody’s permission when the plan belongs to a team. The fix is a name in the header and a name against every post-lock change, and it is the cheapest fix on the list.

The unit mismatch between plan and board is the defect that wastes the most meeting time, because it produces a room in which the plan says twenty-four, the board shows fifty-odd cards and nobody is wrong. It is fixed in the header, by stating the counting unit, and on the board, by counting in it. The remaining three — no version or date, target costs that never become quotes, and channel-blind totals — are each a missing column, and each is fixed by adding it before the architecture lock rather than after the buy has found the gap. A plan with all seven fixes in place is still a spreadsheet; the question of whether the board can drift from it is a separate one, covered on line board vs spreadsheet, Miro and Airtable and visual line planning software.

See the Platform →

Frequently asked questions

What is a line plan?
A line plan is the numeric architecture of a season’s line: the planned option slots by category, price tier and delivery, with the planned units, retail, target cost and margin each slot carries, agreed before the styles exist. It is a table with a header, one row per planned option slot, and totals rows that reconcile to the open-to-buy at cost, the planned receipts at retail, the option ceiling and the margin target. The line board fills its slots with styles and colors; the line sheet later sells what the board became.
What does a line plan contain?
A header stating the category, season, counting unit, version, owner, envelope and price architecture; one row per planned option slot carrying its slot ID, category or class, price tier and planned retail, target cost and initial markup, planned units, receipt dollars at cost and at retail, delivery or drop, carryover or new flag, fabric platform or material group, channel flags, status and owner; and totals rows by tier, by delivery and by material group that reconcile to the open-to-buy, the receipts plan, the option ceiling, the blended margin target and the newness target.
What is one row in a line plan?
One planned option slot: a place in the line that a specific option will fill, defined by its tier, delivery, units, price and cost before the option is designed. In apparel the slot is a style-colorway. In footwear it is a style-colorway committing a size run of pairs; in beauty a shade within a franchise; in home and furniture a model in a finish; in toys an item; in jewelry a design in a metal. The plan states its unit in the header, because a count in styles and a count in style-colorways differ by the average number of colorways per style.
What totals does a line plan have to reconcile to?
Seven. Receipt dollars at cost to the open-to-buy envelope; receipt dollars at retail to the financial plan’s receipt line; the option count to the ceiling the architecture stage set from minimums and budget; the retail-dollar-weighted blended initial markup to the margin target; the newness share, by slot and by unit, to the newness target; units per fabric or material platform to the mill or component minimum; and units per delivery to the delivery calendar and the floor or account capacity in that window.
How is a line plan different from a line board?
The plan is the numbers and the board is the picture of the same range. The plan says how many slots each tier and delivery holds and what units, price and margin each carries; the board decides which bodies and colors fill those slots and shows whether the result reads as a range. They have to be counted in the same unit, and a card cut on the board has to change the count in the plan. The full three-way distinction, with the line sheet, is on the line board vs line sheet vs line plan page.
How does a line plan change through the season?
It is cut in five versions. The strategy draft carries tiers, count ranges, the newness share and the delivery count, with no slot rows. The architecture lock adds every slot row with units, cost and delivery and reconciles the totals to the envelope. The post-review versions map slots to proposed styles and record swaps and cuts with reasons. The post-lock version locks counts cell by cell and replaces target costs with quotes as they confirm. The hindsight version appends actual receipts, sell-through, markdown and realized margin beside every slot.
What is the illustrative plan on this page?
A hypothetical women’s dresses category across good, better and best and two drops: 24 slots, 8,250 planned units, $246,250 of receipts at cost against a $250,000 envelope, $635,500 at retail, and a blended initial markup, weighted by retail dollars, of 61.25% against a 61% target. Every figure is invented so that the arithmetic can be checked; none of it is a benchmark.
Is a line plan the same as a range plan?
Yes. Range plan is the UK and European name for the same document — the counted slots by tier and phase with their units, price and margin — and range architecture, range review and phasing map to line architecture, line review and drops. The word-by-word map is on how to build a range plan.

See how a line board works when it is connected to the plan. In Canvas, the visual board inside RetailNorthstar, merchandisers draft the assortment by placing products on boards, review it as a team and commit it in the meeting, with open-to-buy, option counts, margin and mix moving as they go and nothing re-keyed afterwards.